Classroom and Office Doors and Locks

Project Description:

The doors and hardware project will update every classroom and lab on all three campuses. The new locks will give faculty the ability to lock classroom doors from the interior of the space in the event there is an external threat outside the classroom. This new hardware will also bring a number of doors up to current ADA compliance by eliminating the round knobs found in some of the older sections of campus.

The locks and hardware chosen for this project will also allow for the operation of the locks with proximity cards, keypads or traditional keys. In addition, the new hardware will permit us to integrate the lock software with the college's scheduling software, R25, which will automatically lock and unlock the doors based on the rooms' schedules.

Budget: $2,015,471

Construction Schedule: August 2013–November 2013

Square footage of new construction: N/A

Square footage of renovated area: N/A

Date
Update
March 7, 2014 Programming modifications to enhance functionality of interior locks is complete. Installation and programming of exterior locks on all three campuses is nearing completion. Design of the Graphical User Interface (GUI) to monitor all locks and control exteriors is 99% complete.
February 28, 2014 Programming modifications to enhance functionality of interior locks is 95% complete. Installation and programming of exterior locks on all three campuses is nearing completion. Design of the Graphical User Interface (GUI) to monitor all locks and control exteriors is 97% complete.
February 24, 2014 Programming modifications to enhance functionality of interior locks is 90% complete. Installation and programming of exterior locks on all three campuses is 99% complete. Design of the graphical user interface (GUI) to monitor all locks and control exteriors is 90% complete.
February 14, 2014 Programming to enhance functionality of interior locks continues. Installation and programming of exterior locks on all three campuses is nearing completion. Design of the graphical user interface (GUI) to monitor all locks and control exteriors continues.
January 31, 2014 Testing of wi-fi lock access controls (R25 and credentials) continues. Programming of wi-fi locks at office suite doors is 97% complete.
January 24, 2014 Integration of the new Interior wi-fi locks with the room scheduling software (R25) is complete at all three campuses. Testing of wi-fi lock access controls (R25 and credentials) is on-going. Programming of wi-fi locks at office suite doors is nearing completion.
January 17, 2014 Programming and testing to link the new interior wi-fi locks with the room scheduling software (R25) is complete at all three campuses. Testing to link new interior wi-fi locks with credentials is nearing completion. Programming of wi-fi locks at office suite doors is in progress.
January 3, 2014 Installation of additional doors and hardware is complete at all three campuses. Programming and testing to link the new Interior wi-fi locks with the room scheduling software is on-going. This process will continue through the Winter Break.
December 27, 2013 Programming and testing to link the new Interior wi-fi locks with the room scheduling software is on-going. This process will continue through the Winter Break.
December 20, 2013 Programming of the Exterior Locks to campus schedules is complete at Southlake, remains 97% complete at the Grayslake Campus, and approximately 60% complete at Lakeshore. Programming to link the new Interior wi-fi locks with the room scheduling software is on-going. Testing of the wi-fi locks has commenced. This process is expected to be completed during the winter break.
December 13, 2013 Programming to link the Exterior Locks to designated work stations is complete at Southlake, approximately 97% complete at the Grayslake Campus, and in progress at Lakeshore. Programming to link the new Interior wi-fi locks with the room scheduling software continues. Testing of the wi-fi locks will commence next week. This process is expected to be completed by the end of the semester.
December 6, 2013 Programming to link the Exterior Locks to designated work stations is approximately 95% complete at the Grayslake Campus and in progress at Southlake and Lakeshore. Programming to link the new Interior wi-fi locks with the room scheduling software continues. This process is expected to be completed by the end of the semester.
November 29, 2013 Programming to link the Exterior Locks to designated work stations is nearing completion. Programming to link the new Interior wi-fi locks with the room scheduling software is in progress. This process is expected to be completed by the end of the semester.
November 22, 2013 Programming to link the Exterior Locks to designated work stations continues. Programming to link the new Interior wi-fi locks with the room scheduling software has begun. This process is expected to be completed by the end of the semester.
November 15, 2013 Programming to link the Exterior Locks to designated work stations is in progress. Programming to link the new Interior wi-fi locks with the room scheduling software is scheduled to begin shortly. This process is expected to be completed by the end of the semester.
November 8, 2013 Programming is scheduled to commence shortly to link the new Interior wi-fi locks with the room scheduling software and the new Exterior locks with designated workstations. This process is expected to be completed the week of December 16th.
November 1, 2013
  • Programming will begin within 1-2 weeks to link the new Interior wi-fi locks with the room scheduling software.
  • Rough Electrical work for Exterior Doors is complete at all three campuses.
October 25, 2013
  • Minor finishing work is complete for Interior door installations at all three campuses.
  • Programming will begin within 1-2 weeks to link the new Interior wi-fi locks with the room scheduling software.
  • Rough Electrical work is complete on Exterior door locations at Grayslake, and nearing completion at the Southlake and Lakeshore campuses.
October 18, 2013
  • Minor finishing work is approximately 97% complete on the Interior doors at Grayslake.
  • Programming will begin within the next few weeks to link the new Interior wi-fi locks with the room scheduling software.
  • Rough Electrical work is approximately 95% complete on Exterior door locations at Grayslake and has begun at the Southlake and Lakeshore campuses.
October 11, 2013
  • Minor finishing work is approximately 95% complete on the Interior doors at Grayslake.
  • Programming will begin shortly to link the new Interior wi-fi locks with the room scheduling software.
  • Rough Electrical work is nearing completion on Exterior door locations at Grayslake and will begin at the Southlake and Lakeshore campuses this week.
October 4, 2013
  • Minor finishing work is nearing completion on the Interior doors at Grayslake. This work has been completed at the Southlake and Lakeshore campuses.
  • Programming coordination is in progress to link the new Interior wi-fi locks with the room scheduling software.
  • Rough electrical work is progressing on exterior door locations this week at the Grayslake campus.
September 30, 2013
  • Minor finishing work continues on the interior doors at Southlake and Grayslake; Lakeshore Punch List is completed.
  • Programming work has begun to link the new Interior locks with the room scheduling software.
  • Rough electric work continues on exterior doors this week at the Grayslake campus.
September 23, 2013
  • Minor finishing work continues on the Interior doors at all three campus.
  • Programming work has begun to link the new Interior locks with the room scheduling software.
  • Work began on exterior door locations this week at the Grayslake campus.
September 16, 2013 The new interior doors and locks have been installed on all three campuses, with the exception of a few that are backordered. We continue to work on implementing the software for the system, and anticipate the integration with the locks and our scheduling software to be completed later this October. Next week we will begin the installation of the exterior doors and hardware, starting with the C and B Wings.
 